Scope

A rule list sets one value of a connection point. The first true rule from the top wins, and the Default applies when no rule is true. For each field, see What a rule condition can read field definitions. See also How plant control works.

Location

  • Path: the plant control, Diagram tab, the diagram menu, Edit, then double-click the point.
  • Rule lists: tabs of the Settings dialog, for example Target Power or Max Limit.

The Settings dialog for a grid connection point, on the Target Power tab

Permissions

  • See the rule lists: all access levels. A Viewer double-clicks a device on the diagram and sees its rule lists without the Save button.
  • Change and save the rule lists: Editor, Installer or Full control.

Step 1: Default

  1. Open the tab of the rule list.
  2. In the Default row, click the pencil icon.
  3. Type the Value, in watts on a power list.
  4. On Target Power, type the Grid/Storage Priority.
  5. Click Save in the rule dialog.

Set the Default to the usual value of the point. The plant control skips an invalid rule, so the Default must be safe.

Step 2: Rules

  1. Click Add.
  2. In the new row, click the pencil icon.
  3. Under What it does, set the Value.
  4. Under When it applies, set a minimum of one time filter or an Expression.
  5. Read the summary line at the top of the dialog.
  6. Click Save in the rule dialog.

A rule open, showing the summary line, What it does and When it applies

Make two rules for a window that includes midnight. Also make two rules for a window that includes the start of a new year. A single rule with From after To applies only from To to From, at the opposite times. Make one rule to 23:59 and one rule from 00:00, or one rule to 31 December and one rule from 1 January.

Step 3: Rule Order

  1. Drag each rule above the rules that it overrides.

A rule that is true all the time belongs in the Default.

Step 4: Save

Examine all rules before you click Save. Save sends all the rule lists of the point with no confirmation, and the next control cycle uses them.

  1. At the bottom of the Settings dialog, click Save.
  2. Make sure that Save Success shows.

Troubleshooting

  • Invalid Value. or Invalid priority.: the box is empty or does not hold a number.
  • Invalid Logic Expression: Every condition needs both sides selected: select a reading on each side of the row.
  • Invalid Logic Expression: Expression with FIXED field has invalid value: type a number in each Fixed Value box.
  • Invalid Period Selection. Please select at least 1 filter.: set a filter or an expression, or put the value in the Default.
  • Invalid Year Period!: the date is not a calendar date, for example 31 February.
  • Not saved: followed by rule n has no filter: open that rule and save it, or delete it.
  • Save Error: followed by the logger reply: send a screenshot to support.
  • A red row: the rule reads a device or a variable that the plant no longer has. Change the rule or delete it.
  • A rule does not win: a rule above it is true first. On Target Power, On/Off State, Max Limit and Min Limit, the row that wins is green.

Tips and Gotchas